
Before
This is our latest project.
Shower and Bathroom Floor
We removed the old plastic shower liner, installed new copper piping, moister barrirer and backer board. Once the moister barrier, backer board and new copper piping was installed IN went the tile with inlay, bull nose edging and new shower handles.
Once the shower was complete the carpet was pulled and new floor tile was installed
